Tag Archives: Valentines Day

Valentine Sock and 1/3…

is unveiled!

It takes about 34,000 stitches to knit an average pair of socks – I made it to about 20,000 before I had to stop and wrap!!!

Hmm, what’s this?  …

Sock Unveiling1

Is it a book? …

Sock Unveiling2

No wait, it’s a “finish it yourself” pair of socks …

Sock Unveiling3

At least one foot will stay warm …

Sock Unveiling5

Will he be wearing the second sock before the weather turns warm???

ONLY TIME WILL TELL 🙂

♥ HOPE YOU HAD A WONDERFUL VALENTINE’S DAY ♥

February 2013 Marathon Recap…

Or just how much knitting got knit?

The results are in and here’s how my time was spent…

  • Knitting – 13 hours and 12 minutes
  • Sleeping ~ 6-1/2 hours (somehow I can’t seem to get it under 6 – knitting CAN be exhausting!)
  • Eating ~ 2-1/2 hours
  • Taking pictures, posting updates ~ 2-1/2 hours
  • Other ~ 1-1/2 hours (you don’t want the details, trust me)

Check out fellow bloggers…  At Margareta’s Haus and Not Your Average Zoe – I noticed they were knitting up a storm as well!  I love the mini-chevron blanket that Zoe was working on and Margareta definitely had me beat with her production of 2 skirts and the beginnings of a baby sweater!

This month I knit more hours than the total of everything else:  13.2 hours knitting / 13 hours doing other.  In March I am going to really try to up the hours of ACTUAL knitting!!!  Ideas???

Lessons Learned…

  • Knitting something that is to be a surprise?  Schedule activities for that person so they won’t be hanging around impeding progress!
  • Decide from the beginning that you will be okay with slow-going if you work with teeny tiny needles!
  • Be ready to RIP if necessary and don’t waste time wallowing in self-knitty-pity.

Revelations Revealed and Resolutions made…

  • The break in my yarn won’t be noticed until I am 3/4 of the way across a really complex cable and lace row.   Resolution:  Don’t waste time, just “tink” it and get over it.
  • I WILL make a grand statement that I will be wearing a finished knitted item by the end of the Marathon JUST BEFORE I do the math and realize I couldn’t possibly finish even if I had 4 hands to knit with and twice as much time. 🙂  Resolution:  Don’t whine, just keep knitting until the end, I’ll be much farther along than when I started!
  • I WILL find all sorts of reasons to knit for myself rather than someone else.  Resolution:  Banish the quilt and knit on!

JOIN ME for my next Marathon which will begin Friday, March 8th at 7pm EST and run through 9:32pm on Saturday, March 9th.  This will be a ROAD-TRIP marathon for me, so I am excited to see how it will work out!

♥ How did your Valentine knitting projects end up? ♥

Valentine Knitting Updates…

Will I finish the socks?  Will I finish the sweater?

I am determined to find a way to answer Yes to both!

Over the weekend I did my grocery shopping and meal-planning for the week so I am in good shape there.  Cleaning is in check and my evening commitments are minimal.  I will be studying by day with all breaks spent knitting.  By the start of my February Knitting Marathon on Sunday afternoon, I’m hoping my project status will be…

  • Pete’s socksready to turn the heel on the second sock
  • My Valentine sweater front finished and 2 sleeves cast on

First sock with the toe ready to be seamed using the Kitchener Stitch

1stSockProgress3

Voila, the first sock is done…

1stSockDone

And the front of my cables & lace  Valentine sweater is progressing nicely…

ValentineSweater_ProgressFront3

Short posts this week – gotta stay focused!!!

♥ Happy Valentine Knitting to ALL ♥

Apparently cats aren’t that into blogging.

How was I to know???

All week while I thought my progress was being posted, my guest blogger…

CusterAsleepOnJob

 Was either asleep on the job, or…

CustersDayJob

Daydreaming!!!

I am happy to report though that progress WAS MADE on both Pete’s socks and my Valentine’s Day sweater.

Close to finishing sock #1 – getting ready to start the toe!

1stSockProgress2

And here is the front of my Valentine’s Day sweater catching up to the back!  I will focus on this project over the weekend while Pete is around 🙂

ValentineSweater_ProgressFront2

So here we are in February!  Just 12 days til Valentine’s Day – if you haven’t started knitting for your LOVE, you may want to think about other options.  Here’s some advice from the Yarn Harlot (Stephanie Pearl-McPhee)…

“When confronted with a birthday [or Valentine’s Day] in a week I will remember that a book can be a really good present, too.”
Stephanie Pearl-McPhee, At Knit’s End: Meditations for Women Who Knit Too Much

If you still think you have the time and you want to show your kitty how much you care, try knitting her/him some fish* …

DSC03668

Despite the fact that she fell asleep on the job, I may knit up one of these for Custer!

♥ Happy Valentine Knitting (or book browsing) to ALL ♥

*Opens a link to the Ravelry project page with a free PDF pattern for the cute knitted fishies. 

Studying, knitting and welcoming…

my guest blogger for the week!

I am pleased and excited to introduce you to…

My cat Custer who will be taking over writing duties for the week.  I think she will do great and I’m anxious to get your reactions to her guest posts.

GuestBloggerCuster

 

So what do I think of the striped socks Cheryl is knitting?

Custer_withStripedSox

Let’s just say I’m glad they’re not for me.  My human, Pete is a pretty easy going guy though.  I think he will take those socks right in stride.  Now whether he will wear them outside of the house… that may be open for debate.

Alright now, back to my day job…

SleepingOnREbooks

Valentine’s Day is just 18  days away – why not knit something special* for the feline in your life!!!

♥ Happy Valentine Knitting to ALL ♥

*Opens a link to the PawsitiveKnits.Wordpress blog (Dublin SPCA) with a PDF pattern for a knitted mouse. 

Dear red sweater of mine…

will you be my Valentine?

I’m hoping the answer will be yes and I will be wearing my Cables & Lace sweater on February 14th, but looking at the calendar I see that there are only 18 days left!!!

While that SEEMS like a long time, I took a quick look at my schedule and available knitting time on those 18 days looks a bit scarce.  I will be at home a few days next week studying for a certification, but the keys words there are “studying”.  And any study breaks will have to be spent knitting Pete’s socks since those are supposed to be a surprise.

Bottom line:  Something else is gonna have to give!

  • Grocery shopping – we have food in the pantry and I see nothing wrong with cereal for dinner!  No shopping = 2 extra knitting hours next week.
  • Cleaning – this chore is already overdue, I might as well let the dust accumulate and get it all at once right?  No cleaning = 3 more hours of knitting.
  • Cooking – allowing Pete to experience the pleasure of cooking should free up about 5 hours next week.  But wait, our agreement is whoever cooks the other cleans up, so I’ll need to add back about 15 minutes per night.  After doing the math, that’s an extra 3 hours 45 minutes.
  • Sleeping – Not Negotiable!  If I don’t get enough sleep I’ll end up ripping more than usual.  No time gained here.
  • Blogging – I have lined up a guest blogger for next week, stop back tomorrow to meet her.  I think you will enjoy her fresh take on things.   Guest blogger adds 5 hours to my knitting time next week.

Things are looking up!  I just may be able to get both Pete’s socks AND my sweater done by the 14th.

♥ Happy Valentine Knitting to ALL ♥

Do these stripes…

make my fingers look fat?

StripesFatFingers

I know what you’re all thinking.  I need to get out more.

But seriously now, I’m having some funny thoughts about these stripes, as in…  I can’t wait to see the expression on Pete’s face when he opens his Valentine’s Day gift from me and it’s the pair of socks he’s been hounding me to knit, but they are…

STRIPED

in a BIG

and COLORFUL

and NOT REALLY MANLY way.

Note to self:  Have camera battery charged and media card empty, I am going to want to capture this on film for sure 🙂

Funny, but I suddenly have a renewed interest in finishing up these socks lickity split!

Here is the heel gusset started…

HeelGussetStarted

And a closeup of the heel gusset – the stripes have turned the corner :-)…

HeelGussetCloseUp

Reminder for those of you knitting for Valentine’s Day…

20 days to knit some WILD STRIPED socks for the one you love 

♥ Happy Valentine Knitting to ALL ♥

Be careful when knitting for someone you Love…

the results may not be what you expect!

“If you were ever dumped after knitting a guy a sweater, consider the possibility that the problem was with the sweater, not you. The recipient probably took one look at the thing, imagined a lifetime of having to pretend to like (and wear) this sweater and others of its like, and saw no choice but to flee into the night”
Stephanie Pearl-McPhee, Knitting Rules!: The Yarn Harlot’s Bag of Knitting Tricks

Today, I looked at the stripes forming on the socks I’m knitting for Pete and paused…

KnittingHeelFlap

Then I remembered, HE has been the one hounding me to knit him a pair of socks!  That and since we’ve been married for a good bit of time, I think it’s more likely he will dump the socks if he just can’t imagine a future pretending to like cute striped socks.

Then again if he LIKES the socks, it’s me who may be doomed to a future of knitting mens socks on tiny needles leaving no time for knitting coats, cardigans, pullovers, skirts, tunics, vests, hats, scarves, or shawls for me!

Hmm…

No Cheryl, it just wouldn’t be kind to intentionally knit some weirdness into Pete’s socks.  They’re a Valentine’s Day gift after all!  Yes, wait until you’re knitting some “just because” socks to add some wildness.  That should stave off the sock requests.

Back to the socks!!!

I am picking up the slipped stitches on the side of the heel flap, knitting into the back of the stitch to twist the stitch and thus prevent holes….

PickingUpSideSts_HeelFlap_TwistedSts2ElimHoles

Voila, the side stitches are nice and tight…

PickedUpSideStsThruBack_HeelFlap

Sock trivia… the average sock contains 17,000 stitches, times 2 = 34,000 teeny tiny stitches.  THE THINGS WE DO FOR LOVE!

21 days until Valentine’s Day – that’s still 3 WEEKS of knitting time – Go for it!!!

♥ Happy Valentine Knitting to ALL ♥

love, Love, LOVE…

this Valentine Sweater of Mine

I set aside Pete’s socks for the last couple days and picked up the Cables and Lace Filati sweater that I am knitting “pour Moi”.

The yarn is a hand-dyed, worsted weight, 100% merino called “Gather”.  It was created by Downtown Knits in Apex, NC.  I really like the way it knits up – it’s “soft and springy” and I think the cables and lace really show off the way that it is softly variegated.   Every time I go back to knitting this sweater I think, “I CAN’T WAIT TO WEAR IT!”

Hurry Hurry Hurry – Knit Knit Knit – PATIENCE PATIENCE PATIENCE (is NOT my strong suit)

The size 6 & 7 needles felt like timber posts compared to the zeroes I’ve been using for the socks.  It’s always nice to change things up a bit.

Here is my lovely red sweater back all bound off and waiting…

ValentineSweater_BackFolded

To be matched up with it’s lovely front that was cast on…

ValentineSweater_FrontCastOn

And ribbed while biking  (hey if you only have time to knit or exercise, I say why not do both!)

ValentineSweater_FrontRibbing2

Do you see the extra ends at the left?  Stationery bike accident.  I let my feed yarn hang a little too close to the pedals.  You can probably figure out what happened. 🙂

Ribbing finished, changed to the larger circs for the main pattern (Ah, that’s better – a little more room on the needles)

ValentineSweater_FrontOntoCircs

Then knit some more…

ValentineSweater_ProgressFront

Well now, that is a good bit of progress!

With Valentine’s Day just 22 days away, you better get your gift knitting in gear!  Especially if you’re knitting for your special someone AND yourself!!!

Does anyone remember what movie this line is from…  Love means never having to say you’re sorry ?

If you guessed it, we were probably born in the same decade 🙂

I am definitely NOT sorry I spent the last three days’ entire knitting allotment on my Valentines Sweater – back to Pete’s socks tomorrow I promise!

♥ Happy Valentine Knitting to ALL ♥

Love is spending your precious knitting time…

on someone other than yourself

Today, I continued to work on the Valentine socks for Pete. 

Here is the heel flap started…

KnittingHeelFlap

Here it is ready to be turned…

KnittingHeelFlapDone

And, here is the “turning of the heel” (see my techniques page for helpful sources, but the basic premise it that you start with the middle stitches of the heel, leaving X number of stitches on either side and as you knit back and forth, you either SSK or P2Tog with one of the side stitches until all side stitches are used up – if you follow your pattern step-by-step you will find yourself turning a heel in no time!) …

HeelTurnBegun

And the heel turn is complete…

HeelTurnDone

“Go forth ye beginning knitter and tremble not, the turning of the heel is but a simple art.  Once mastered ye will sock-veteran be and chuckle at how ye used to flee…  the ‘turning of the heel’ like it be the ‘taming of the shrew*’.” 

Never was any good at Shakespearean literature, better stick to my knitting.

*In case you were wondering, a shrew is… “A small mouse-like insectivorous mammal with a long pointed snout and tiny eyes; or an assertively aggressive woman.”  I hear they are both very difficult to tame.

Only 27 more knitting days until Valentine’s Day – still time to show your love!!!

Love is…  turning a heel for someone other than ye-self

Farewell thee loyal reader, until we knit again…

♥ Happy Valentine Knitting to ALL ♥